The Port of Gdynia Authority S.A. manages and develops the infrastructure of the Port of Gdynia, one of the leading universal ports in the southern Baltic and a key Polish transport and logistics hub.
The port specialises in general cargo, particularly containers and ro-ro traffic, and handles ro-pax ferries, conventional cargo and various dry and liquid bulk commodities. It is also the largest grain port in the Baltic Sea Region.
Container operations are conducted at Baltic Container Terminal (ICTSI) and Gdynia Container Terminal (Hutchison Port Holdings). In 2025, the port handled over 1 million TEU for the first time in its history. Its strategy focuses on expanding capacity, improving maritime accessibility and developing direct ocean connections. Following dredging works, the port can accommodate vessels up to 400 m long, 60 m wide and with a draft of 14.5 m.
The Port of Gdynia is part of the TEN-T core network and the Baltic-Adriatic Corridor. Its connection to Scandinavia is supported by the Gdynia–Karlskrona Sea Motorway, operated by Stena Line.
Core activities:
Managing port real estate and infrastructure.
Planning and implementing long-term port development.
Constructing, expanding, maintaining and modernising infrastructure.
Acquiring land for port investments.
Providing port infrastructure services and ship waste reception facilities.
Protecting the environment and ensuring high standards of ship, cargo and passenger security.
Adapting infrastructure to evolving market needs.
Key investments:
Intermodal Terminal at the Port Logistics Centre – Construction of new 750-metre railway tracks, a manoeuvring yard and a ramp for heavy civilian and military vehicles. The project aims to increase rail transport and support dual-use infrastructure.
Outer Port – Development of a new pier with a container terminal, a target capacity of at least 2.5 million TEU annually (approximately 25 million tonnes), an area of 150 ha and over 2 km of operational quays.
Fuel Handling Station Expansion – Increasing annual handling capacity from 3.2 million to 6 million tonnes and enabling the reception of tankers approximately 300 m long and up to 170,000 DWT. Completion is planned for 2028, strengthening Poland's energy security.
If you want to be informed about map actualization subscribe to our newsletter