Hupac starts building its new terminal in Poland

The construction of the Brwinów terminal, located near Warsaw, has begun, with the start of operations slated for Q3 2022.

The terminal will cover nearly 14 ha, offering in the first phase four transshipment tracks, with a minimum length of 750 m, and a 42k m2-big storage yard. Freight handling will be carried out with the use of reachstackers.

In the second phase three more tracks will be added. Gantry cranes will be deployed, too.

The Brwinów terminal will have an annual handling capacity of up to 180k cargo units.

Photo: Hupac